Substrate Check

A useful note on substrate checks before coating, screed or repair work begins.
Failure usually starts in the slab, long before any coating or screed is mixed. Substrate Check looks at moisture in the concrete, weak surface laitance, cracking, oil or chemical contamination, and whether the base can carry the specified build. On South African sites, those checks often decide if preparation needs to change before bond and finish are put at risk.
This note stays close to what can be seen, tested and recorded on site. Gauteng dust, Durban humidity and Western Cape winter damp all change how concrete presents before repair or coating work starts. If this page fits your site, send the page slug through the contact form with a short site description.
Concrete conditions checked first
- Slab age and curing noted
- Photos of cracks, joints and damaged areas
- Specified system matched to substrate condition
- Site contact and work area named clearly
Read the related system information after this note. Substrate Check sets out what the base is doing on site, while the catalogue page deals with material build and use. That split helps teams compare product claims against the actual concrete in front of them.
First walk before preparation
Substrate Check focuses on what to verify before coating, screed or repair work starts. The note covers the slab condition, obvious defects and site factors that can affect bond and finish.
Start with the slab type, the service history and the available shutdown window. A warehouse bay, production area and wash-down zone can sit in the same plant while needing very different substrate decisions. Moisture migration, forklift traffic and cleaning chemicals all matter before preparation methods are chosen.
Take photos before grinding, chipping or washing changes the surface. Mark the bay, room or line number so defects can be tied back to the right area later. That record is useful when hollow spots, old repairs or hidden contamination only become clear after preparation begins.
What the note should leave
The aim is a clear reading of the substrate before coating, screed or repair work proceeds. That includes visible defects, likely bond risks and any site factor that can affect cure or finish. A short, accurate check at this stage is more useful than broad assumptions made after materials arrive.
Link Substrate Check to the relevant plant note and system page before scope is expanded. Review the inspection pack once more before it leaves site, especially photos, crack locations and moisture findings. On the contact form, use the page name and include one image of the slab in its present condition.
- Substrate issues listed by work area
- Initial slab condition photographed before preparation
- Related: Systems, Plant plays, and Floor notes
- Email record tied to the inspection note
Site factors that change results
Conditions around OR Tambo, Sunnyrock and Crown Mines can differ sharply from one building to the next, even within the same programme. Existing coatings, old patch repairs, movement at joints and heavy traffic patterns all affect what the slab is ready for. Separate urgent shutdown work from routine maintenance items so the inspection does not blur two different needs.
Coastal air can keep concrete wetter for longer, especially in enclosed areas with poor ventilation. Inland dust can mask weak surface zones until cleaning or grinding starts. Load-shedding also changes inspection timing where lighting, extraction or moisture testing equipment is part of the check.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Information worth sending ahead
A useful note on substrate checks before coating, screed or repair work begins.
| Path | substrate-check |
|---|---|
| Hub | journal |
| Mailbox | Contact form |
It helps to file this note while the inspection details are still fresh. Include the project reference, area name, intended finish and any known history of leaks, impact damage or previous repairs. That gives buyers, site teams and applicators a shared starting point before specification decisions are made.